STAGE 1 ONLY · COORDINATOR ROUTE
East Wanneroo Precinct 8 — Ranch Road · Stage 1 only
Mariginiup · SPN/2387 · 261.96 ha · approximately 2,500 dwellings [R]
Who
Qube Property Group coordinates the landowner group. Rowe Group prepared the plan; JDSI Consulting Engineers is on the consultant team. Named firms are evidenced in the draft plan; current titles and authority to sign are UNVERIFIED. [R]
Why now
WAPC required modifications on 23 Jul 2025. The City page says modifications for final approval and labels the project “Stage K - Subdivision Applications”. Approach the coordinator before servicing choices are locked; the current stage’s procurement status is UNKNOWN. [RS]
Load & network
Stage 1 only is the proposed Zenith opportunity; its current load and band fit are UNKNOWN. Zenith’s fit band: load ≤5 MW · CMD ≤4 MW · connection <10 MW [A]. The plan’s 13.5 MVA ultimate is full-build context outside that band, not the Zenith opportunity; 8 MVA per dedicated feeder. Reinforcement is likely, but may not be needed at Stage 1. The draft TSP forecasts Wanneroo at 103% in 2027; Joondalup transformer/load transfer is a planning-stage action targeting 2030. [R] [N]
What could stop a deal
The draft plan also quotes 25–30 MVA available in 2028; its wording about feeder/substation capacity must be reconciled with Western Power. Full-build MVA is not MW: power factor is UNKNOWN. A staged microgrid is a proposal, not an engineered design. [R]
What hattr does next
Call Qube’s switchboard: (08) 9386 8080 · reception@qubeproperty.com.au. Ask for the Ranch Road / Precinct 8 development manager. Fallback: Rowe’s planning team, (08) 9221 1991. These are company channels. [C]
“I’m hattr, working on Zenith Energy’s hackathon challenge, and we are assessing Stage 1 only of your Ranch Road plan, subject to confirming its load and fit with Zenith’s stated band. Could you introduce the person setting the next stage’s power strategy and share the current Western Power advice so Zenith can assess a staged microgrid option? Can we arrange a joint scoping call before Friday, without assuming Stage 1 has a supply shortfall?”
Advance toward signing: identify the authorised sponsor, confirm whether an energy partner is appointed, and ask Rob which scoped agreement Zenith could consider this week. UNVERIFIED Buyer appetite and a Friday signing path are UNKNOWN.